Always measure from the outside looking in. Measure exactly where the screen will be installed and measurements must be to the nearest millimetre.
Always use the shortest measurement and we will make the necessary deductions.
Ensure you follow all instructions and read all information before proceeding with your order.

Do you have A SUITABLE TRACK?

If you don't have a pip track, once can be installed.

DIAGRAM 3.4

How to Measure

DIAGRAM 3.5

When measuring width make sure you are taking the measurements from inside the channel and to the back of the frame of the fixed panel. This is how wide your door needs to be.

When measuring height make sure you are taking the measurements from the edge of the pip track, to the edge of the pip track. Or if you only have a bottom pip track, measure from the top of the channel to the edge of the pip track.

Measuring Width

Make sure you take at least 3 measurements at 3 different spots when measuring width. You can always take extra measurements if needed, and always double check. Then use the shortest length when submitting your order.

Always remember to measure from the outside.

DIAGRAM 3.1
Measuring Height

When measuring height, take at least 3 measurements. One from the left side, one from the centre, and one from the right side. You can always take extra measurements if needed, and always double check. Use the shortest length when submitting your order.

Always remember to measure from the outside.

DIAGRAM 3.2
Measuring Lock Height

Depending on whether you want the security door lock above or below the existing doors handle will change how you measure your lock height.

If you want the your security door handle below the existing handle, measure to the bottom of the existing, and deduct 60mm.

DIAGRAM 3.3

If you want the your security door handle above the existing handle, measure to the top of the existing, and add 125mm.